| Outotec GmbH |
40 pcs burner system with armature racks and junction boxes. 4,3 MW each. 14 psc for CO-gas, 22 pcs for Tar oil, 4 pcs Dual fuel. For Pelletizing furnace in India. |
2009 |
SCA
Munksund |
2 pcs Gas pilots on heavy oil fired boiler. 120 kW each, Propane. |
2009 |
| Trelleborg Rubore |
Fuel conversion from Light oil to Propane on 2 Incinerators, 2 Thermo oil boiler and 1 hot water boiler. |
2009 |
| Skansen |
New burners for bakery furnace at Solliden Skansen. 2 pcs 85 kW burners for Town gas. |
2009 |
SSAB
Luleå |
Drying furnace for cated products, 600ºC. 6 pulse fired burners for Coke oven gas. |
2009 |
Trelleborg Rubore
Kalmar |
Incinerator system for process gas from vulcanisation press. Incinerator for 9000 nm3/h process gas, 850ºC at 2 seconds, Propane 1,5 MW. Heat exchanger for incoming process gas, heat exchanger for thermo oil pre heating, heat exchanger for district water, Thermo oil boiler 500 kW. |
2009 |
| Outotec GmbH |
32 burner systems with armature racks, 5,3 MW each for Coke oven gas. Pelletizing furnace China. |
2008 |
| UHT |
2 burner systems for pre heating casting set. 1 burner system for rotary dryer. |
2008 |
Horse cremation
Munka-Lungby |
Cremation system for horses, 800 kg batch. 3 pcs natural gas burners in Furnace, 1 pcs of natural gas burner in Incinerator. Cooling system with water injection, Multi cyclone and baghouse. |
2007 |
Painting spray box
Bredäng |
2 pcs of Hot air system for paint box |
2007 |
| Uddeholm Technology Brasilien |
2 burner systems for preheating of casting set. 1 burner system for rotating dryer. |
2007 |
| Studsvik Nuclear |
Burner system and handling system for incineration of contaminated turbine oil. |
2007 |
Lekebergs
Pet Cremation |
Cremation system for small animals, 200 kg batch. 2 pcs oil burners in furnace, 1 pcs of oil burner in Incinerator. Cooling system with water injection, Multi cyclone and baghouse. |
2007 |
Painting spray box
Karlstad |
5 pcs of Hot air system for paint box. |
2007 |
ITT Flygt
Emmaboda |
Refractory dryout and heating system |
2007 |
Painting spray box
Malmö |
Hot air system for paint box |
2007 |
Trelleborg Rubore
Kalmar |
Increase of capacity in existing Incineration plant, Increasing of the Incinerator volume |
2007 |
SEKAB
Örnsköldsvik |
New steam flue gas boiler for Incineration system |
2006-07 |
Ovako Steel
Hofors |
Gas mixing station for propane/butane 30/70 and air to heat value 5 kWh/nm3, 7,5 MW. Equipped with a Flare. |
2006 |
Ovako Steel
Hofors |
2 pcs Batch furnaces, 4ton, 1210ºC, puls fired. |
2006 |